- Score and prioritise AI use cases on a value × feasibility matrix, including error tolerance.
- Compare build, buy and partner options and choose one for a given use case.
- Calculate a three-year total cost of ownership, ROI, payback period and sensitivity range for an AI initiative.
- Design a pilot with success criteria, a comparison group and a production path.
- Explain the evidence-based reasons AI projects fail and plan change management, training, data readiness and governance to avoid them.
Before this: What AI Is (and Isn't), Choosing a Model
Most organisations do not fail at AI because the models are weak. They fail because they pick the wrong problems, underestimate the full cost, never measure the benefit, cannot get a pilot into daily work, or lack the data and governance to scale it. This lesson is the management toolkit for getting AI from slideware to measurable value: how to find and rank use cases, decide whether to build, buy or partner, calculate total cost of ownership and return on investment, run pilots that can graduate to production, and bring people, data and risk management along.
Intuition: AI adoption is a portfolio, not a moonshot
Think like an investor rather than an inventor. You are not looking for the single most impressive AI idea; you are building a portfolio of bets with different sizes, odds and payback times. A few quick, low-risk wins (drafting, summarising, search over internal documents) fund learning and credibility. A smaller number of larger bets (redesigning a core process around AI) carry more risk and more reward. And like any investor you need a way to value each bet, a stage-gate process to stop the ones that are not working, and the discipline to actually stop them.
What the evidence says, briefly
It is worth knowing a few careful studies, because the field is full of unsourced statistics.
- Productivity gains are real but uneven. In a study of more than 5,000 customer-support agents at one company, access to a generative-AI assistant raised issues resolved per hour by about 14% on average, and by about 34% for novice and lower-skilled workers, with little effect for the most experienced (Brynjolfsson, Li and Raymond, NBER working paper, 2023).
- The "jagged frontier". In a field experiment with 758 Boston Consulting Group consultants, those using GPT-4 on tasks inside the model's capabilities completed 12.2% more tasks, 25.1% faster, with results rated more than 40% higher in quality. On a task deliberately chosen to lie outside its capabilities, consultants using AI were 19 percentage points less likely to reach the correct answer than those without it (Dell'Acqua et al., Harvard Business School working paper, 2023). The lesson for adopters: map where the tool helps and where it misleads before rolling it out.
- Why projects fail. A RAND Corporation study based on interviews with 65 experienced data scientists and engineers (Ryseff, De Bruhl and Newberry, 2024) identified five root causes: leaders misunderstanding or miscommunicating the problem to solve; lacking the data needed; chasing the newest technology rather than users' real problems; underinvesting in data and deployment infrastructure; and applying AI to problems too hard for current methods. The report repeats an often-quoted estimate that more than 80% of AI projects fail, but attributes it to "some estimates", not to its own measurement; treat that number as indicative, not established.
- Pilots stall. In July 2024 Gartner predicted that at least 30% of generative-AI projects would be abandoned after proof of concept by the end of 2025, citing poor data quality, inadequate risk controls, escalating costs or unclear business value. This was a forecast, not a measured outcome.
Notice the pattern: almost none of the failure causes is "the model was not good enough".
Step 1: Find and rank use cases
Start from business problems, not from the technology. Good sources: processes with high volumes of repetitive judgement (triage, classification, extraction), work bottlenecked on reading or writing text, decisions made with poor information, and complaints from customers and staff. For each candidate, write a one-paragraph brief: the decision or task, who does it today, volume, current cost and quality, what "better" means, and what data exists.
Then score candidates on two axes, each from 1 to 5:
- Value: size of the benefit (cost saved, revenue gained, risk reduced), how many people or transactions it touches, and strategic importance.
- Feasibility: data availability and quality, technical maturity of the approach, integration effort, risk and regulatory exposure, and the tolerance for errors in that task.
| Use case | Value (1–5) | Feasibility (1–5) | Quadrant |
|---|---|---|---|
| Drafting replies for support agents | 4 | 4 | Do now |
| Invoice data extraction into the ERP | 3 | 5 | Quick win |
| Fully automated credit decisions | 5 | 2 | Strategic bet: de-risk first |
| AI-generated marketing jingles | 1 | 4 | Deprioritise |
Plot them on a 2×2 grid. High value and high feasibility: start now. High feasibility and modest value: quick wins that build skills. High value and low feasibility: strategic bets that need data work or risk mitigation before a pilot. Low on both: drop. Weight the criteria if your organisation cares more about some (a bank might weight regulatory risk heavily). Re-score as you learn; feasibility in particular changes as models improve.
A useful filter on feasibility is error tolerance: what happens when the AI is wrong? Drafts reviewed by a human tolerate errors well. Unreviewed actions with legal, financial or safety consequences do not, and need far more evidence and controls.
Step 2: Build, buy or partner
| Option | What it means | Choose when | Watch out for |
|---|---|---|---|
| Buy | A SaaS product or an AI feature in software you already use | The need is common across companies (meeting notes, coding assistants, generic support) | Vendor lock-in, data handling terms, limited customisation, per-seat cost at scale |
| Build | Your team builds on models via APIs, open-weight models or your own ML | The use case uses proprietary data or process and is a source of differentiation | Ongoing maintenance, need for MLOps or LLMOps skills, slower start |
| Partner | A consultancy, systems integrator or specialist vendor builds or co-develops | You lack skills now but the use case is strategic | Knowledge leaving with the partner, unclear IP ownership |
Most organisations mix them: buy for commodity productivity, build where the data and process are a moat, partner to start fast and transfer skills. "Build" today rarely means training a model from scratch; it usually means building an application, retrieval and evaluation around existing models (see Fine-tuning vs prompting and RAG vs long context vs fine-tuning).
Step 3: Total cost of ownership
Total cost of ownership (TCO) is every cost over the system's life, not just the licence or API bill. Categories:
- One-time: integration engineering, data preparation and labelling, evaluation set creation, security and legal review, initial training of staff.
- Recurring: licences or seats, model and API usage, hosting and infrastructure, monitoring and evaluation, maintenance engineering, vendor management, ongoing training, governance and audit.
- Hidden: human review time, error handling, re-work when models or vendors change, and the opportunity cost of the team.
Worked example: buy vs build for support reply drafting
A company has 60 support agents. Each handles 40 tickets a day for 250 working days a year, so the annual volume is tickets. Average handling time is 10 minutes. All figures below are illustrative assumptions for the exercise. Loaded labour cost is $40 per agent-hour; loaded engineer cost is $180,000 per year.
Buy (a vendor's AI drafting add-on):
- Licences: per year
- Integration with the ticketing system (one-time): $40,000
- Administration and vendor management, 0.2 of an IT person at $150,000: $30,000 per year
- Staff training (one-time): $15,000
Three-year TCO: one-time ; recurring ; total $253,000.
Build (in-house app on a hosted model API):
- Build: 2 engineers for 6 months = 1 engineer-year = $180,000 (one-time)
- Evaluation set and labelling (one-time): $20,000; staff training (one-time): $15,000
- Maintenance, 0.5 engineer: $90,000 per year
- Model API usage: per year
- Hosting, monitoring and observability: $12,000 per year
Three-year TCO: one-time $215,000; recurring ; total $539,000. (For simplicity both options' recurring costs run for all three years.)
Note what dominates: people, not tokens. The model API bill ($18,000 over three years) is about 3% of the build option's three-year cost.
Step 4: Measuring ROI
A pilot with 10 agents measured average handling time falling from 10.0 to 8.5 minutes, with no drop in customer satisfaction. Gross time saved per year: minutes hours, worth .
But saved minutes only become money if the organisation does something with them: absorbs growth without hiring, reduces overtime or contractors, or moves people to higher-value work. Assume a realisation rate of 50%, so the realised benefit is $300,000 per year, or $900,000 over three years.
- Buy: , i.e. 256%. Monthly net benefit , so payback months after go-live.
- Build: , i.e. 67%.
Buying wins here, unless building creates something the vendor cannot offer (deep integration with proprietary knowledge, a differentiating customer experience) worth more than the $286,000 difference. Do a sensitivity check: at a realisation rate of 25% the benefit is $450,000 over three years, so buying still returns 78% but building loses money (−17%). Always show decision-makers the range, not a single number.
Measurement design matters as much as arithmetic. Use a baseline period, a comparison group (agents without the tool, or a staggered rollout), and pre-agreed metrics: a primary outcome (handling time), quality guardrails (customer satisfaction, error and escalation rates), and adoption (share of drafts used). Without a comparison group, seasonal changes and the novelty effect masquerade as AI impact.
def three_year_case(one_time, recurring, annual_benefit, years=3):
cost = one_time + recurring * years
benefit = annual_benefit * years
roi = (benefit - cost) / cost
monthly_net = (annual_benefit - recurring) / 12
payback = one_time / monthly_net if monthly_net > 0 else float("inf")
return round(cost), round(roi, 2), round(payback, 1)
for realisation in (0.25, 0.5, 0.75):
benefit = 600_000 * realisation
print(realisation, "buy", three_year_case(55_000, 66_000, benefit),
"build", three_year_case(215_000, 108_000, benefit))
Step 5: From pilot to production
Pilots often succeed in a demo and die in production. Design them to graduate:
- Define success criteria before starting: target metric, minimum improvement, quality guardrails, and a decision date.
- Use real users, real data and the real workflow, not a sandbox with curated examples.
- Build the evaluation set during the pilot: it becomes the regression suite for production.
- Plan the production path early: security review, data-processing agreements, identity and access integration, monitoring and support ownership. These take weeks; start them in parallel.
- Stage-gate: proof of concept (can it work?) → pilot (does it work for real users?) → limited production (does it hold at scale?) → full rollout. At each gate, continue, change, or stop.
- Name an owner in the business, not only in IT, who is accountable for the outcome.
Step 6: People, change management and training
AI changes how work is done, so adoption is a change-management problem. What helps:
- Explain why, what changes for each role, and what does not. Be honest about effects on jobs; rumours fill silence.
- Involve the people who do the work in design and evaluation. They know the edge cases and become champions.
- Train by role: hands-on practice with real tasks, how to verify outputs, what not to paste into tools, and when to escalate. Refresh as tools change.
- Redesign the workflow, not just add a tool. Decide who reviews AI output, how errors are reported, and how incentives and targets change.
- Measure adoption (active use, share of outputs accepted) and talk to non-users: low adoption is a design signal.
- Remember the jagged frontier: train people on where the tool is unreliable, not only where it shines.
Step 7: Data readiness
Ask, for each use case: Does the needed data exist? Can we legally use it for this purpose (consent, contracts, privacy law)? Is it accessible (APIs, permissions), of sufficient quality (accuracy, completeness, timeliness), and representative of the cases the system will see? For generative AI over documents, readiness also means: are documents current, deduplicated, permissioned correctly (the assistant must not reveal what a user could not otherwise see), and in formats you can parse? Fixing data is often the longest part of the project; budget for it.
Step 8: Risk and governance
Integrate AI into existing risk processes rather than inventing a parallel bureaucracy. A proportionate approach:
- An AI inventory: every system in use, its owner, purpose, data, vendor and risk tier.
- Risk tiering: light-touch review for internal drafting tools; deeper assessment (impact assessment, bias testing, human oversight design, legal review) for systems that affect people's rights, money, health or safety.
- Policies: acceptable use, data handling, vendor due diligence, incident reporting.
- Frameworks: the NIST AI Risk Management Framework (Govern, Map, Measure, Manage) and ISO/IEC 42001 (an AI management-system standard) give structure; sector rules and laws such as the EU AI Act may impose specific duties. See the governance and law lessons for details.
Common pitfalls
- Starting from "we need an AI strategy" or a specific technology rather than a business problem.
- Counting gross time saved as profit, without a realisation plan.
- Comparing licence fees with API prices and ignoring people, integration and governance costs.
- Pilots with no success criteria, no comparison group and no decision date ("pilot purgatory").
- Ignoring data rights and permissions until legal review blocks launch.
- Rolling out tools without training on their failure modes.
- Treating governance as a final sign-off instead of a design input.
In practice
Run a short discovery to list 15–30 candidate use cases, score them on value and feasibility, and pick two or three for pilots with written success criteria. Build a three-year TCO and a sensitivity table for each. Start production paperwork in parallel with the pilot. Report results honestly, including stopped projects, and reinvest in what works. Keep an AI inventory from day one; it is far easier than reconstructing one later.
Key takeaways
- Start from business problems, and rank candidate use cases by value and feasibility, including how costly the AI's errors would be.
- Buy for commodity needs, build where proprietary data and processes differentiate you, and partner to move fast while transferring skills.
- Total cost of ownership is dominated by people, integration and governance, not model usage; time saved is only a benefit if it is realised.
- Show ROI as a range with a sensitivity analysis, and measure benefits against a baseline and comparison group.
- Careful studies attribute AI project failures mainly to problem framing, data, infrastructure and misplaced enthusiasm, not weak models.
- Pilots graduate to production when they have success criteria, real users, an owner, and security, legal and governance work started early.
Terms in this lesson
- Value × feasibility matrix
- A 2×2 prioritisation grid that scores candidate use cases on business value and on how practical they are to deliver.
- Total cost of ownership (TCO)
- All one-time, recurring and hidden costs of a system over its expected life.
- Return on investment (ROI)
- Net benefit divided by cost, expressing how much value an investment returns per unit spent.
- Payback period
- The time needed for cumulative net benefits to recover the up-front investment.
- Realisation rate
- The share of a theoretical benefit, such as time saved, that actually turns into financial or operational value.
- Pilot purgatory
- The state in which AI pilots run indefinitely without success criteria or a decision to scale or stop.
- Jagged technological frontier
- The uneven boundary of AI capability, under which similar-looking tasks may be done well or badly by the same model.
- AI inventory
- A maintained register of an organisation's AI systems with their owners, purposes, data, vendors and risk tiers.
Check your understanding
- 1.
A use case scores Value 5 and Feasibility 2 because the needed data is fragmented and regulatory exposure is high. What is the best next step?
- 2.
An AI tool saves 20,000 staff hours a year worth USD 50 per hour. Management expects to redeploy 40% of the freed time to valuable work. What is the realised annual benefit?
- 3.
A project costs USD 200,000 in total over three years and delivers USD 500,000 in realised benefit over the same period. What is the ROI?
- 4.
Which reason for AI project failure is NOT among the five root causes in the 2024 RAND study?
- 5.
Which situation most clearly favours buying over building?
Exercises
Work each problem before opening the solution.
- Exercise 1Core
Score these four use cases for a mid-sized insurer on value and feasibility (1–5), place each in a quadrant, and justify briefly: (a) summarising claim files for adjusters, (b) fully automatic claim denial, (c) extracting fields from scanned repair invoices, (d) an AI-written company poem for the annual party.
Show solution
One defensible scoring:
- (a) Summaries: value 4 (adjusters spend much time reading), feasibility 4 (text data exists; humans review outputs, so errors are tolerable). Do now.
- (b) Automatic denial: value 4, feasibility 1–2 (decisions affect customers' rights; high legal and regulatory exposure; errors are costly and the system needs explainability and oversight). Strategic bet at most, more likely redesign as decision support with human sign-off.
- (c) Invoice extraction: value 3, feasibility 5 (well-understood document AI; easy to verify against totals). Quick win.
- (d) Poem: value 1, feasibility 5. Deprioritise (fine as an individual's use of a general tool, not a project).
Other scores are acceptable if justified; the key point is that error tolerance and regulatory exposure sharply reduce feasibility for (b).
- Exercise 2Core
Using the lesson's buy and build numbers, recompute the three-year ROI of both options if the pilot showed handling time falling from 10.0 to 9.0 minutes instead of 8.5 (realisation rate still 50%). Which option should the company choose?
Show solution
Time saved: 600,000 × 1.0 min = 600,000 min = 10,000 h, worth 10,000 × $40 = $400,000 gross. Realised at 50%: $200,000/yr, $600,000 over 3 years.
- Buy: TCO $253,000. ROI = (600,000 − 253,000)/253,000 = 1.37 (137%).
- Build: TCO $539,000. ROI = (600,000 − 539,000)/539,000 = 0.11 (11%).
Buy. Building barely breaks even and would only make sense for strategic reasons not captured in the time savings.
- Exercise 3Core
Modify the lesson's
three_year_casefunction so it also returns the break-even realisation rate: the realisation rate at which ROI equals zero, given the gross annual benefit. Compute it for buy and build with gross benefit $600,000/yr.Show solution
ROI = 0 when benefit × years = cost, i.e. gross × r × years = one_time + recurring × years, so r* = (one_time + recurring × years) / (gross × years).
def break_even_rate(one_time, recurring, gross_annual, years=3): return (one_time + recurring * years) / (gross_annual * years) print(round(break_even_rate(55_000, 66_000, 600_000), 3)) # buy print(round(break_even_rate(215_000, 108_000, 600_000), 3)) # buildBuy: 253,000 / 1,800,000 = 0.141 (14.1%). Build: 539,000 / 1,800,000 = 0.299 (29.9%). Buying pays off if the organisation captures just 14% of the time saved; building needs about 30%. Presenting break-even points like this is often more persuasive than a single ROI figure.
- Exercise 4Challenge
Design a 12-week pilot for the support-drafting tool that can credibly support a go/no-go decision. Specify participants, comparison design, primary and guardrail metrics, data to log, decision criteria, and the production-readiness work to run in parallel.
Show solution
A strong design:
- Participants: 20 agents chosen across tenure levels and queues (the Brynjolfsson et al. study suggests effects differ by experience). Volunteers bias results; prefer random selection among willing agents.
- Comparison: a staggered rollout or a randomly assigned control group of 20 similar agents, plus 4 weeks of baseline data for all 40, so seasonal effects can be differenced out (difference-in-differences).
- Primary metric: average handling time per ticket.
- Guardrails: customer satisfaction, reopen and escalation rates, QA-audited accuracy and policy compliance, agent satisfaction.
- Adoption metrics: share of tickets where a draft was used, edit distance between draft and sent reply.
- Logging: ticket ID, agent, draft shown, final reply, timestamps, model and prompt version.
- Decision criteria (agreed in advance): go if handling time falls ≥ 10% relative to control with no guardrail worse beyond an agreed margin, and adoption ≥ 60% by week 10; iterate if gains are smaller but positive; stop otherwise.
- In parallel: vendor security review and data-processing agreement, single sign-on integration, data-retention settings, AI inventory entry and risk tiering, support ownership, training materials, and an evaluation set built from pilot tickets for regression testing after launch.
- Exercise 5Challenge
A board member cites '95% of AI projects fail' and proposes halting all AI spending. Write a short, evidence-based response (about 200 words) that is honest about the risks without overstating or inventing evidence.
Show solution
A good response:
"Failure-rate headlines vary widely in method, so I would not base the decision on any single percentage. The more careful evidence points to specific, manageable causes. RAND's 2024 interview study of 65 practitioners found projects fail mainly because the problem is poorly defined, the data is missing, teams chase technology rather than user needs, infrastructure is underfunded, or the problem is beyond current methods. Gartner predicted in 2024 that at least 30% of generative-AI projects would be abandoned after proof of concept, because of data quality, risk controls, costs or unclear value. Meanwhile, controlled studies show real gains where the tool fits the task, for example a 14% average productivity increase among support agents in an NBER study, larger for novices, while a Harvard Business School field experiment found AI hurt performance on tasks outside its capabilities.
So the answer is not to stop, but to invest selectively: fund a small number of well-defined use cases with written success criteria, comparison groups, realistic TCO and a stage-gate that stops what does not work. I propose we review results at each gate."
Key qualities: it does not repeat an unverified statistic, cites the sources accurately, and turns risk into a governance process.
Further reading
- articleRyseff, De Bruhl & Newberry, The Root Causes of Failure for Artificial Intelligence Projects and How They Can Succeed (RAND, 2024)
- paperBrynjolfsson, Li & Raymond, Generative AI at Work (NBER Working Paper 31161, 2023)
- paperDell'Acqua et al., Navigating the Jagged Technological Frontier (Harvard Business School Working Paper 24-013, 2023)
- docsNIST, Artificial Intelligence Risk Management Framework (AI RMF 1.0, 2023)
- docsISO/IEC 42001:2023, Artificial intelligence — Management system
Go further
Sources
- RAND Corporation, The Root Causes of Failure for Artificial Intelligence Projects and How They Can Succeed (2024)
- Gartner press release, Gartner Predicts 30% of Generative AI Projects Will Be Abandoned After Proof of Concept By End of 2025 (29 July 2024)
- Brynjolfsson, Li & Raymond, Generative AI at Work (NBER, 2023)
- Dell'Acqua et al., Navigating the Jagged Technological Frontier (HBS, 2023)
Fact-checked and last reviewed 2026-11-05